Our Work

Installing parlors and milking systems for dairy farms large and small.

Reuben Esh

MARCH 2026 |  GORDONVILLE, PA

Double 8 Parallel Milking Parlor
DeLaval MA200 Milking Points and I-Cabinet Automation

"We are very pleased with the work JBZ did in helping us move from a tie-stall to our used Double 8 parallel parlor. Even though the equipment was moved from another farm, Jay and Matt knew exactly how to set everything back up and where to beef things up. The DeLaval MA200 milking points and takeoffs worked right from day one. We especially appreciated that they helped us push cows and train our family on how to best use the new equipment. The cows stayed calm and took to the parlor better than we expected for being a tie-stall herd. The project stayed on schedule, and we would certainly recommend JBZ to anyone looking for help with a similar parlor installation."

— Reuben Esh (March 2026)

DeLaval MU Blue Takeoffs | Milking Parlor Installation in Ephrata, PA

Cocalico Holsteins

APRIL 2022 | EPHRATA, PA

2-1/2" Center Alley Pipeline for 130 Tie-Stalls

DeLaval MU Blue Takeoffs

"We've been milking 130 cows with 12 takeoffs in an hour and a half to an hour and 45 minutes. Milking in the new pipeline for a little over a year, we're averaging close to 60,000 somatic cell count. I feel like the milkout is faster milking from the rear with our new Center Alley Pipeline layout, and am especially pleased with the consistency with which we are able to prep cows - that's one reason why we are able to milk so fast, because the cows are immediately ready to let down their milk when the claw gets put on. The milkhouse was built with a capacity for 16 takeoffs, but we only run 12 because the milkers are already busy the entire milking and we don't need to go any faster."

— Paul B. Zimmerman Jr. (July 2023)

Vision Farms

AUGUST 2021 | LITITZ, PA

40-Stall Delaval E300 Rotary Parlor

"We're milking 570 cows in only 3 hours, three times a day. My average SCC is 110,000. Although it was a big learning curve, we feel that the equipment is doing a good job, and we are very close to meeting our top goals for quality and efficiency."

— Ronald Conley (July 2023)

Lititz, PA. Milking Parlor Installation | JBZ Dairy
DeLaval VMS V300 Robotic Milking System Installation | Pitman, PA

Hepler Dairy Farm

APRIL 2021 | PITMAN, PA

2 DeLaval VMS V300 Robots

1 DeLaval Opti-Duo Feed Pusher

"JBZ's installation was professional and the work was done quickly. Both the VMS V300 robots and the Opti-Duo Feed Pusher are meeting our expectations; they are saving us time and helping us to use our time more efficiently. We are milking over 110 cows and have room for up to 150. We are averaging 2.7 milkings per day and our counts are good. Since installation, we've added a few optional accessories to the VMS V300 units, including a DeLaval Multi-Filter MF500 Dual Filter Frame; we wish we would've added them sooner! The Dual Filter Frame is a big convenience."

— Dalton Miller (July 2023)

       Larry Hepler's Son-In-Law